Bi-Weekly Project Update for 05/31/2021 – 06/13/2021
Two Week Look Ahead - DDOT
Transfer to temporary poles (7th to 14th Street).
Install 20Ft & 28.5 SL/TS Poles (7th to 14th St)
Pulling Electric Cables for communication and streetlight (4th to 14th street)
Work on Medians (14th street to 13th street)
Work on Brick sidewalk (9th Street) (outbound)
Miss Utility Tickets -Maryland Ave NE between 14th St and 6th St
Tree Protection (14th Street to 8th Street)
Saw Cutting (B/W 7th and 14th St)
Traffic/street light foundations (8th to 14th St)
PCC Base Repairs (B/W 8th and 14th St)
Remove and reinstall 18" RCP MH-32 to MH-33
Two Week Look Ahead - Washington Gas and Light Ahead
4th St & C St NE continue disconnects
260 Maryland Ave, replace gas service
Project Updates – DDOT
Transfer to temporary poles (7th to 14th Street).
Install 20Ft & 28.5 SL/TS Poles (7th to 14th St)
Pulling Electric Cables for communication and streetlight (4th to 14th street)
Work on Bio-retention (Elliot street) (outbound)
Work on Bump-outs (Elliot to 14th Street) (outbound)
Tree Protection (14th Street to 8th Street)
Saw Cutting (B/W 7th and 14th St)
Traffic/street light foundations (8th to 14th St)
PCC Base Repairs (B/W 8th and 14th St)