Bi-Weekly Project Update for February 8-21, 2021
Two Week Look Ahead - DDOT Project
Transfer to temporary poles (7th to 14th Street).
Install 20Ft SL/TS Poles (7th to 14th Street)
Work on bump-outs and straight curb (10th and 11th Street) (Outbound)
Work on Brick sidewalk (9th to 8th Street) (Outbound)
Miss Utility Tickets -Maryland Ave NE between 10th St and 14th St.
Tree Protection (14th Street to 8th Street)
Saw Cutting (B/W 7th and 14th St)
Traffic light foundations (8th to 14th St)
E. Pipe Stubs for street lights
SD I-40
SD M-38 (13th St intersection)
SD Basin Connecting Pipe M-7 to I-16 (7th Street)
Test Pits (B/w 10th and 14th St)
PCC Base Repairs (B/W 7th and 14th St)
SD MH-7 (7th Street Intersection)
To Week Look Ahead - Washington Gas and Light Ahead
600 Block of Maryland Ave NE- Inbound Lane, Services Installation
400 Block of C St NE - Inbound Lane, Services Installation
300 Block of Mass. Ave Continue gas main installation
1200/1300 Block of Maryland Ave continue disconnects.
Project Updates – DDOT
Transfer to temporary poles (7th to 14th Street).
Install 20Ft SL/TS Poles (7th to 14th Street)
Work on bump-outs and straight curb (10th and 11th Street) (Outbound)
Work on Brick sidewalk (9th to 8th Street) (Outbound)
Miss Utility Tickets -Maryland Ave NE between 10th St and 14th St.
Tree Protection (14th Street to 8th Street)