Maryland Ave Community Information
Bi-Weekly Project Update 06/28/2021 – 07/11/2021
Two Week Look Ahead - DDOT
Transfer to temporary poles (7th to 14th Street).
Install 20Ft & 28.5 SL/TS Poles (7th to 14th St)
Pulling Electric Cables for communication and streetlight (4th to 14th street)
Work on Medians (7th street to 6th street)
Topsoil on Medians (13th street,7th to 10th street)
Work on Brick sidewalk (12th Street intersection) (Outbound)
Tree Protection (14th Street to 8th Street)
Saw Cutting (B/W 5th and 14th St)
Traffic/street light foundations (5th to 12th St)
PCC Base Repairs (B/W 6th and 12th St)
Two Week Look Ahead - Washington Gas and Light
4th St & C St NE continue disconnects
260 Maryland Ave, replace gas service
Project Updates – DDOT
Transfer to temporary poles between 7th to 14th Street.
Install 20ft & 28.5ft SL/TS poles between 7th to 14th Street.
Pulling cables for the communication &streetlights between 4th to 14th St.
Granite curb and brick sidewalk at 9th Street) (outbound)
Excavation, granite curb & median installation at Maryland Ave between 13th St & 14th St.
Miss Utility Tickets - Maryland Ave NE BTW 14th and 7th St.
Tree Protection (14th Street to 2nd Street)
Saw Cutting (B/W 7th and 14th St)
Traffic/street light foundations (8th to 14th St)
Traffic light foundations between 8th to 14th St.
PCC base repairs between 8th St and 14th St.
Remove and reinstall 18" RCP MH-32 to MH-33.
Topsoil on the median between 9th St to 10th St
Brick sidewalk installation at 8th Street intersection(outbound)
Inlet 34 installation at 11th St and MD Ave