Biweekly Project Update 11/01/2021 – 11/14/2021

Two Week Look ahead by DDOT contractor

  • Tree Protection (14th Street to 3rd Street)

  • Saw Cutting (B/W 14th and 2nd St) As required

  • Grounding test on electrical manholes

  • Pulling 4/0 cables (8th to 3rd street)

  • Pulling 100 pair communication cable (14th to 3rd street)

  • Remove existing streetlight poles and energize the new poles (14th to 6th street)

  • Remove existing Foundations (14th to 2nd street)

  • Pavement Marking (6th street to 2nd street) DC LINE

  • Landscaping (13th to 6th) COOPER

  • Installing Signs (14th to 3rd street)