Biweekly Project Update 7/26/2021 – 08/08/2021

Two Week Look ahead by DDOT contractor

  • Transfer to temporary poles (11th street)

  • Install 20Ft & 28.5 SL/TS Poles (7th to 14th St)

  • Pulling Electric Cables for communication and streetlight (8th to 3rd street)

  • Pulling Fiber optic cables (14th to 7th street)

  • Work on Granite curb and sidewalk (4th to 3rd street)

  • Brick sidewalk (4th to 3rd street) Subcontractor EURO

  • Roadway Milling (14th to12 street) (Inbound)

  • Brick sidewalk (4th and Mass Ave, & on Medians) Subcontractor EURO

  • Miss Utility Tickets -14th & Maryland Ave NE to 2nd street

  • Transfer to temporary poles (7th to 14th Street).

  • Traffic/streetlight foundations (8th to 3rd St)

  • PCC Base Repairs (B/W 6th and 12th St)


Project Updates – DDOT

  • Transfer to temporary poles between 7th to 14th Street

  • Install 20ft & 28.5ft SL/TS poles between 7th to 14th Street.

  • Pulling cables for the communication &streetlights between 4th to 14th St.

  • Granite curb and brick sidewalk at 9th Street) (outbound)

  • Excavation, granite curb & median installation at Maryland Ave between 13th St & 14th St.

  • Miss Utility Tickets - Maryland Ave NE BTW 14th and 7th St.

  • Tree Protection (14th Street to 2nd Street)

  • Saw Cutting (B/W 7th and 14th St)

  • Traffic/street light foundations (8th to 14th St)

  • Traffic light foundations between 8th to 14th St.

  • PCC base repairs between 8th St and 14th St.

  • Topsoil on the median between 9th St to 10th St

  • Brick sidewalk installation at 8th Street intersection(outbound)

  • Restoration work around the Park

  • Inlet 22 installation at 8th St and MD Ave