• Maryland Ave Community Information

Biweekly Project Update 8/23/2021 – 09/05/2021

Two Week Look ahead by DDOT contractor

  • Tree Protection (14th Street to 3rd Street)

  • Pulling Electric Cables for communication and streetlight (10th to 3rd street)

  • Pulling Fiber optic cables (14th to 3rd street)

  • Remove existing streetlight poles and energize the new poles (14th to 8th street)

  • Work on Granite curb and sidewalk (3rd to 2nd street) Outbound

  • Work on Brick Gutter (3rd to 2nd street)

  • Milling (11th to 8th street)

  • Pavement Marking (14th street to 11th street) Subcontractor DC LINE

  • Saw Cutting (B/W 6th and 2nd St) As required

  • PCC Base Repairs (B/W 10th and 3rd St) As required

  • Clean storm Sewer inlets and manholes


Project Updates – DDOT

  • FMCC continued transfer to temporary poles between 7th St to 14th St.

  • FMCC continued install 20ft & 28.5ft SL/TS poles between 7th St to 14th St.

  • FMCC cont. pulling cables for the communication &streetlights from 10th St to 3rd St.

  • FMCC continued excavation, granite curb and brick sidewalk at Maryland Ave between 2nd and 4th St.

  • Omni continued Traffic light foundations between 5th to 12th St.

  • Omni continued cleaning storm sewer manholes and inlets on Maryland Ave between 14th St to 4th St.










43 views2 comments