Biweekly Project Update 11/15/2021 – 11/28/2021
Two Week Look ahead by DDOT contractor
Grounding test on electrical manholes
Pulling 4/0 cables (6th to 3rd street)
Pulling 100pair communication cable (8th to 3rd street)
Remove existing streetlight/Traffic signal poles (7th to 3rd street)
Energize the Traffic signals (6th to 3rd street)
Energize the street light poles (8th to 3rd street)
Remove Existing streetlight/ Traffic Foundations (12th to 8th street)
Pavement Marking (In front of Chick-fil A)
Landscaping- Plants installation (14th to 3rd street)