Biweekly Project Update 11/15/2021 – 11/28/2021

Two Week Look ahead by DDOT contractor

  • Grounding test on electrical manholes

  • Pulling 4/0 cables (6th to 3rd street)

  • Pulling 100pair communication cable (8th to 3rd street)

  • Remove existing streetlight/Traffic signal poles (7th to 3rd street)

  • Energize the Traffic signals (6th to 3rd street)

  • Energize the street light poles (8th to 3rd street)

  • Remove Existing streetlight/ Traffic Foundations (12th to 8th street)

  • Pavement Marking (In front of Chick-fil A)

  • Landscaping- Plants installation (14th to 3rd street)