Project Update 10/04/2021 – 10/31/2021
Two Week Look ahead
Tree Protection (14th Street to 3rd Street)
Saw Cutting (B/W 14th and 2nd St) As required
Grounding test on electrical manholes
Pulling 4/0 cables (8th to 3rd street)
Pulling 100pair communication cable (14th to 3rd street)
Remove existing streetlight poles and energize the new poles (14th to 6th street)
Remove existing Foundations (14th to 2nd street)
Pavement Marking (6th street to 2nd street) DC LINE
Landscaping (13th to 6th) COOPER
Installing Signs (14th to 3rd street)
Project Updates – DDOT
FMCC continued energizing street light poles between 2nd St to 14th St.
FMCC continued working on signal heads and traffic signal control cabinets BTW 2nd St to 14th St.
FMCC cont. pulling cables for the communication &streetlights from 15th St to 3rd St.
FMCC completed paving from 6th St to 2nd street.
DC Line continued thermoplastic pavement marking from 8th to 2nd St Light