• Maryland Ave Community Information

Project Update December 28, 2020-January 3, 2021

Updated: Jan 29



12/28/2020 – 01/03/2021

Two Week Look Ahead - DDOT Project

  • Transfer to temporary poles (5th to 12th street).

  • Install 20Ft SL/TS Poles (6th to 12th St)

  • Installation of curb and gutter, (10th and 9th Street)

  • Work on Bump-outs and Brick sidewalk (9th to 11th street)

  • Miss Utility Tickets – from 14th St to 10th & Maryland Ave NE

  • Tree Protection (14th Street to 8th Street)

  • Traffic light foundations (7th to 14th St)

  • Sd connect I-57 (14th St Intersection)

  • PCC Base Repairs (B/W 11th and 14th st)

To Week Look Ahead - Washington Gas and Light Ahead

  • 300 Block of Maryland Avenue NE – SVCS (Inbound Lanes)

  • 300 Block of Mass Ave NE, Gas main installation.

Project Updates – DDOT

  • Transfer to temporary poles on between 6th to 12th St.

  • Installation of 20Ft SL/TS Poles between 6th to 12th St.

  • Installation of curb, gutter and brick sidewalk installation at Maryland Ave, inbound from 9th St to 10th St.

  • Brick gutter, wheelchair ramps, granite curb and brick sidewalk for the bump outs at inbound from 9th St to 10th St.

  • Storm Drain Inlet I-57 installation at 14th St intersection.

  • PCC Base Repairs on Maryland B/W 11th St and 14th St.



13 views0 comments