Project Update January 11-17, 2021
01/11/2021 – 01/17/2021
Two Week Look Ahead - DDOT Project
Transfer to temporary poles (5th to 12th street).
Install 20Ft SL/TS Poles (6th to 12th St)
Installation of curb and gutter, (9th and 8th Street)
Work on Bump-outs and Brick sidewalk (9th to 8th street)
Miss Utility Tickets -Maryland Ave NE between 10th St& 14th St
Tree Protection (14th Street to 8th Street)
Saw Cutting (B/W 6th and 12th St)
Traffic light foundations (8th to 14th St)
Test Pits (B/w 10th and 14th St)
PCC Base Repairs (B/W 9th and 14th St)
SD MH-7 (7th street intersection).
Storm Drain Manhole 33 & 32 and RCP storm drainpipe installation on the MD Ave
between 6th St and 7th St intersection.
Storm Drain Manhole 4 installation on the MD Ave and 4th St intersection.
Storm Drain Inlet -13, and basin connection pipe installation on the MD Ave at D St.
Cast in place Storm Drain Manhole 7 on the MD Ave at 7th St intersection)
To Week Look Ahead - Washington Gas and Light Ahead
600 Block of Maryland Ave NE, Inbound, Continue installation of the gas services.
4th & Maryland Ave NE, and 7th & C St, Continue gas main installation.
1200/1300 Block of Maryland Ave, continued disconnects.
Project Updates – DDOT
Transfer to temporary poles on between 5th to 12th St.
Installation of 20Ft SL/TS Poles between 6th to 12th St.
Installation of curb, gutter and brick sidewalk installation at Maryland
Ave, inbound from 9th St to 12th St.
PCC Base Repairs (B/W 9th and 14th St)