- Maryland Ave Community Information
Project Update March 16-22
Electrical conduit, duct bank, light pole foundations at 10th St, 8th St, between 7th St and 4th St.
Installed proposed storm sewer MH-1 on Maryland Avenue between 2nd and 3rd Street NE.
Electrical conduit, duct bank, light pole foundations at 9th St, 8th St and between 4th St and 2nd St.
Installed proposed storm sewer MH-2 on Maryland Avenue between 2nd and 3rd Street NE.
Electrical conduit, duct bank, light pole foundations at 9th St, 8th St and between 4th St and 2nd St.
Excavated trench for Catch Basin I1 on Maryland Avenue between 2nd and 3rd Street NE.
Basin connect pipe from MH 1 to I1on Maryland Avenue between 2nd and 3rd Street NE.