Project Update March 16-22



  • Electrical conduit, duct bank, light pole foundations at 10th St, 8th St, between 7th St and 4th St.

  • Installed proposed storm sewer MH-1 on Maryland Avenue between 2nd and 3rd Street NE.

  • Electrical conduit, duct bank, light pole foundations at 9th St, 8th St and between 4th St and 2nd St.

  • Installed proposed storm sewer MH-2 on Maryland Avenue between 2nd and 3rd Street NE.

  • Electrical conduit, duct bank, light pole foundations at 9th St, 8th St and between 4th St and 2nd St.

  • Excavated trench for Catch Basin I1 on Maryland Avenue between 2nd and 3rd Street NE.

  • Basin connect pipe from MH 1 to I1on Maryland Avenue between 2nd and 3rd Street NE.