Project Update November 16-22, 2020


Two Week Look Ahead - DDOT Project

  • Transfer to temporary poles (5th to 12th street).

  • Install 20Ft SL/TS Poles (6th to 12th St)

  • Installation of Brick Sidewalk, work on bump-outs (13th and 14th St intersection)

  • Work on Bio retention (6th and Mass Ave)

  • Work on lead walks (12th to 13th Street) (Inbound)

  • Saw Cutting (B/W 6th and 12th St)

  • Streetlight foundations (6th to 12th St)

  • Test Pits (B/w 11 and 14th St)

  • E. MH-11.02 to MH-11.04 (11th St intersection)

  • SD Basin connecting Pipe I-42 to M-22

  • SD FC-2 and M-12 (9th St intersection)

Two Week Look Ahead - Washington Gas and Light Ahead

  • 300 Block of Maryland Avenue NE – MAIN (Inbound Lanes)

  • 600 Block of Maryland Avenue NE - MAIN - (Inbound Lanes)

  • 1300 Block of Maryland Avenue NE Disconnect, Various Locations: 13th & Maryland Avenue, Elliott St & Maryland Avenue, G St & Maryland Avenue NE

Project Updates - DDOT

  • Transfer to temporary poles (5th to 12th street)

  • Install 20Ft SL/TS Poles (6th to 12th St)

  • Street light foundations (6th to 12th St)

  • Installation of Brick Sidewalk, work on bump outs and Bio‐retentions (6th St and Mass Ave)

  • Test Pits (B/W 11th and 14th St)

  • SD M‐23 to M‐22 storm drainpipe installation

  • SD Basin connecting Pipe installation form I‐42 to M‐22

  • SD Basin connecting Pipe I‐27 to M‐14 installation

  • SD Basin connecting Pipe SD FC-2 and M-12 (9th St intersection).