Project Updates 06/15-21/2020

Updated: Jun 24



The two week look ahead is now included as a part of the project update. The updates, which included work performed for the DDOT project, are listed after the two week look ahead.


Two Week Look Ahead 06/22-07/05, 2020

DDOT PROJECT

  • PCC Base Repairs (Maryland Ave B/W 2nd to 4th Street)

  • Bump-outs and wheelchair ramps installation (Maryland Ave B/W 2nd to 4th Street)

  • Wheelchair ramps, sidewalk curb and gutter installation (3rd Street & Constitution Ave)

  • Installation of Brick Sidewalk (Maryland Ave Inbound at G Street)

  • Transfer to temporary poles (Maryland Ave B/W 2nd to 5th Street)

  • Install 20Ft stop light /traffic signal poles (Maryland Ave B/W 2nd to 8th Street)

  • Traffic light Foundations installations (Maryland Ave B/W 4th Street and Mass Ave)

  • Electrical trenching, conduit, manhole and light pole foundation installation work (Maryland Ave B/W Stanton Park, 4th Street, 5th Street and C Street)

  • Roadway Saw Cutting for the utility work (B/W 6th and 7th Street)

  • Storm Drain Structures Installation (Maryland Ave outbound at 5th, 6th, 7th, 8th, D & G Streets)


WASHINGTON GAS PROJECT


Infrasource

  • Crew 1 on the abandonment between 6th St. & Maryland Ave and 7th St & Maryland Ave

  • Continue tie ins at the northeast corner of D St, 7th St & Maryland Ave.

  • Crew 2 is currently working on the main installation on the 1300 Block of Maryland Ave inbound.

Fort Myer Construction Corporation

  • Street and sidewalk restoration for the Washington Gas trenches on Maryland Avenue, outbound 1300 block.


DDOT Project Update June 15-21, 2020


  • The team continued bump‐outs and ramps installation at Maryland Ave inbound between the G St to 13th St.

  • The team continued bus stop pads installation at inbound Maryland Avenue near 4th Street

  • Continued transfer to temporary poles on Maryland Ave between 2nd to 6th St.

  • Continued concrete encased electrical conduit duct bank and light pole foundations installation on Maryland Avenue around Stanton Park.

  • Continued PCC Base Repairs on Maryland Ave between 2nd to 4th St.

  • Installed storm drain inlet I-14 on Maryland Avenue, inbound near the D St.

  • Continued East traffic light foundations installation at 3rd St and Constitution Ave.

  • Installed storm drain inlet I-15 on Maryland Avenue, outbound near the 7th St


Lane Closures

  • As a part of the Maryland Avenue NE Streetscape Project, DDOT and FMCC will continue daily lane closures on the outbound and inbound lanes at multiple locations on Maryland Ave NE between 2nd Street and 14th Street during summer and fall this year.

  • DDOT will maintain one lane each direction during daily lane closures

  • The daily lane closures for the DDOT work will be performed from 8:00am-5:00pm Monday – Friday and Saturdays as needed, weather and construction conditions permitting.