Project Updates March 23-29, 2020



The Maryland Ave NE Streetscape team continues to work on making Maryland Ave NE a safer experience for all users of the corridor. Updates for the week of March 23-29 are as follows:

  • Installed electrical conduit at E St between 8th and 6th St and manhole at C St between 6th St and 4th St

  • Storm drain reinforced concrete pipe installed on Maryland Ave between 2nd and 3rd St

  • Milled existing surface pavement on the two travel left lanes on Maryland Ave NE between 12th and 14th St

  • Surface asphalt overlay on two left travel lanes on Maryland Ave NE between 12th and 14th St