Maryland Ave Community Information
Project Updates March 23-29, 2020
The Maryland Ave NE Streetscape team continues to work on making Maryland Ave NE a safer experience for all users of the corridor. Updates for the week of March 23-29 are as follows:
Installed electrical conduit at E St between 8th and 6th St and manhole at C St between 6th St and 4th St
Storm drain reinforced concrete pipe installed on Maryland Ave between 2nd and 3rd St
Milled existing surface pavement on the two travel left lanes on Maryland Ave NE between 12th and 14th St
Surface asphalt overlay on two left travel lanes on Maryland Ave NE between 12th and 14th St